Past ZBA Applications

In an effort to increase access to applications that have been filed in the last three months and acted upon by the Zoning Board of Appeals, Planning Division staff will post on this page application materials, decisions and public comments received during the application process.  Town staff will make every effort to include all materials, but please note that due to time or technical constraints, everything may not immediately be posted.

If you believe an application item is missing, please send an email to the Planning Division, referencing the application name and address.

146B & 1442 Main Street - 110 & 11B Highland Street - Center & Main Earth Removal 9/9

  1. Center and Main - Appeal Cover Letter Complaint filed 9-30-21
  2. Center and Main Earth Removal - Sep 9 21 FINAL
  3. Center and Main - Applicant Public Hearing Presentation 7-8-21
  4. Center and Main - De Maximis Letter Final 7-7-21
  5. Center and Main - Applicant Response 7-6-21
  6. Center and Main - GPI Nobis Peer Review 7-6-21
  7. Center and Main - Applicant Response to GPI Review 6-30-21
  8. Center and Main - Applicant Response to GPI Review 6-23-21
  9. Center and Main - GPI Nobis Peer Review 6-3-21
  10. Center and Main - GPI Consultant Review Scope of Work 4-27-21
  11. Center and Main - Attachment D - Design Plans - Williams Sparages, LLC
  12. Center and Main - Attachment B - Record Deed-Plan
  13. Center and Main - Attachment E - Landscape Slope area Plan
  14. Center and Main - Attachment C - GIS Property Cards
  15. Center and Main - Attachment A - Site Photos
  16. Center and Main - Application Materials
  17. Center and Main - Exhibit 8 Concord Trucking Plan to 2352 Main St
  18. Center and Main - Exhibit 7 MASS DOT Trucking Regs
  19. Center and Main - Exhibit 6 Center and Main earth removal process 11-12-2020
  20. Center and Main - Exhibit 5 Patriot Trucking Plan
  21. Center and Main - Exhibit 4 Concord Line of site Trucking Plan
  22. Center and Main - Exhibit 3 June 2018 ATR
  23. Center and Main - Exhibit 2 1440 Main St PRD Traffic Consultant Second Review 10-19-18
  24. Center and Main - Exhibit 1 1450 Main St RTC 10.03.18
  25. Center and Main - Earth Removal Letter 2-11-21
  26. Center and Main - Save 1442 Main Presentation 7-8-21
  27. Center and Main - Letter Dolan 7-7-21
  28. Center and Main - Letter Blass Sloane 7-7-21
  29. Center and Main - Letter Gasperine 7-7-21
  30. Center and Main - Letter Isen 7-7-21
  31. Center and Main - Letter Shea 7-7-21
  32. Center and Main - Letter Nelson 7-7-21
  33. Center and Main - Letter StCroix 7-7-21
  34. Center and Main - Letter Wachsler Bossert 7-7-21
  35. Center and Main - Letter Dritt 7-7-21
  36. Center and Main - Letter Bush 5-24-21
  37. Center and Main - Letter Sweeny Seely 6-10-21
  38. Center and Main - Letter Mlodozeniec 6-10-21
  39. Center and Main - Letter Comer Knudson 6-9-21
  40. Center and Main - Letter Whitney 6-8-21
  41. Center and Main - Letter Greene 6-8-21
  42. Center and Main - Letter Constable 6-7-21
  43. Center and Main - Letter Hayes 6-7-21
  44. Center and Main - Letter Bryant 6-7-21
  45. Center and Main - Letter Hirschler 6-4-21
  46. Center and Main - Letter Carter 6-3-21
  47. Center and Main - Letter Rothrock 6-2-21
  48. Center and Main - Letter Yarchak 6-2-21
  49. Center and Main - Letter Stapleton 5-28-21
  50. Center and Main - Letter Crowell 5-25-21
  51. Center and Main - Letter Katz 5-25-21
  52. Center and Main - Letter Madigan 4-7-21
  53. Center and Main - Letter N. Dadi F Stein Esq 5-25-21
  54. Center and Main - Letter Shoup 5-12-21
  55. Center and Main - Letter Owen 5-12-21
  56. Center and Main - Letter Li 5-11-21
  57. Center and Main - Letter L.Goldstein 5-11-21
  58. Center and Main - Letter P.A.Goldstein 5-11-21
  59. Center and Main - Letter Szal 5-11-21
  60. Center and Main - Letter Detweilier 5-11-21
  61. Center and Main - Letter Reeves 5-6-21
  62. Center and Main - Letter Sabin 5-4-21
  63. Center and Main - Letter Kundert 5-3-21
  64. Center and Main - Letter Felshin 5-3-21
  65. Center and Main - Letter WeissCurran 5-2-21
  66. Center and Main - Letter J.Stein 4-7-21
  67. Center and Main - Letter M.Collins 4-7-21
  68. Center and Main - Letter Daly-StCroix-Wilson 4-5-21
  69. Center and Main - Letter M.Amster 4-2-21
  70. Center and Main - Letter J.Miller 4-1-21
  71. Center and Main - Letter E.Quakenbush 4-2-21
  72. Center and Main - Letter J.Miller 4-1-21
  73. Center and Main - Letter M.Andersson 3-31-21

166 Main St - Concord Academy Centennial Arts Center - 12/8

  1. 166 Main St - Application
  2. 166 Main St - Project Narrative
  3. 166 Main St - Site Plans
  4. 166 Main St - Floor Plans
  5. 166 Main St - Elevations
  6. 166 Main St - Existing and Proposed Conditions
  7. 166 Main St - Proposed Plans, Elevations, and Views
  8. 166 Main St - Parking Narrative and Diagrams
  9. 166 Main St - Impervious Surfaces Diagrams
  10. 166 Main St - Stormwater Report
  11. 166 Main St - Applicant Parking Analysis 7-28-22
  12. 166 Main St - Applicant Amendment Letter 8-18-22
  13. 166 Main St - Floodplain Compensatory Storage Analysis 8-18-22
  14. 166 Main St - Night Views
  15. 166 Main St - Engineering Comments 8-31-22
  16. 166 Main St - Water-Sewer Comments 8-31-22
  17. 166 Main St - Landscape Plans 9-6-22
  18. 166 Main St - Fire Comments 9-7-22
  19. 166 Main St - Applicant Parking Analysis 9-13-22
  20. 166 Main St - Applicant Response 9-15-22
  21. 166 Main St - Revised Stormwater Report 9-15-22
  22. 166 Main St - Revised Site Plans 9-15-2022
  23. 166 Main St - Cafe and Parking Counts Memo 9-20-22
  24. 166 Main St - Engineering Comments 9-26-22
  25. 166 Main St - Stormwater Report 10-4-22
  26. 166 Main St - CPW Applicant Response 10-5-22
  27. 166 Main St - Revised Site Plans 10-20-22
  28. 166 Main St - 1998 Special Permit
  29. 166 Main St - 2004 Special Permit
  30. 166 Main St - 2005 Special Permit
  31. 166 Main St - 2015 Special Permit
  32. 166 Main St - Planting Plan
  33. 166 Main St - Transportation Impact Study 10-28-22
  34. 166 Main St - Engineering Comments 11-4-22
  35. 166 Main St - Applicant Response to Engineering 11-14-22
  36. 166 Main St - Revised Engineering Comments 11-21-22
  37. 166 Main St - Town Planner Report 11-22-22
  38. 166 Main St - Town Planner Report REVISED 11-28-22
  39. 166 Main St - West Campus Sustainability Initiatives 11-28-22
  40. 166 Main St - Previous Parking Relief Applications Concord Center Memo 11-28-22
  41. Parking Study for Umbrella Arts Center 9-29-17
  42. Parking Study for Caffe Nero 55-57 Main St 11-2-17
  43. Supplimental Parking Study for Caffe Nero 55-57 Main St 11-6-17
  44. Supplimental Parking Study for Caffe Nero 55-57 Main St 1-24-18
  45. Parking Study for Concord Free Public Library 4-10-19
  46. 166 Main St - PB Recommendation 12-6-22

48Y Fitchburg Turnpike - 3/23

  1. 48Y Fitchburg Turnpike PRD - Application 6-13-22
  2. 48Y Fitchburg Turnpike PRD - Traffic Report 3-25-22
  3. 48Y Fitchburg Turnpike PRD - Sudbury Water District Vote 5-17-22
  4. 48Y Fitchburg Turnpike PRD - Civil Plans 6-9-22
  5. 48Y Fitchburg Turnpike PRD - Stormwater Drainage Report 6-9-22
  6. 48Y Fitchburg Turnpike PRD - Application Narrative 6-13-22
  7. 48Y Fitchburg Turnpike PRD - Dwelling Landscape Plan 7-7-22
  8. 48Y Fitchburg Turnpike PRD - Overall Landscape Plan Rendering 7-7-22
  9. 48Y Fitchburg Turnpike PRD - Overall Landscape Plan 7-7-22
  10. 48Y Fitchburg Turnpike PRD - Fire Comments 7-13-22
  11. 48Y Fitchburg Turnpike PRD - Engineering Comments 7-19-22
  12. 48Y Fitchburg Turnpike PRD - Intermunicipal Agreement 7-19-22
  13. 48Y Fitchburg Turnpike PRD - CMLP Comments 7-20-22
  14. 48Y Fitchburg Turnpike PRD - NRC Comments 7-20-22
  15. 48Y Fitchburg Turnpike PRD - Applicant Response Letter 7-21-22
  16. 48Y Fitchburg Turnpike PRD - Revised Civil Plans 7-21-22
  17. 48Y Fitchburg Turnpike PRD - Revised Stormwater Drainage Report 7-21-22
  18. 48Y Fitchburg Turnpike PRD - Updated Side Load Elevation 7-24-22
  19. 48Y Fitchburg Turnpike PRD - Planner Report 7-26-22
  20. 48Y Fitchburg Turnpike PRD - Applicant Presentation 7-26-22
  21. 48Y Fitchburg Turnpike PRD - Engineering Comments 8-2-22
  22. 48Y Fitchburg Turnpike PRD - Revised Stormwater Drainage Report 8-8-22
  23. 48Y Fitchburg Turnpike PRD - Concord Electric Extension Civil Plan 8-8-22
  24. 48Y Fitchburg Turnpike PRD - Applicant MEPA Email 8-10-22
  25. 48Y Fitchburg Turnpike PRD - Applicant Response Letter 8-18-22
  26. 48Y Fitchburg Turnpike PRD - Revised Civil Plans 8-19-22
  27. 48Y Fitchburg Turnpike PRD - Engineering Comments 8-24-22
  28. 48Y Fitchburg Turnpike PRD - Applicant Zone II Response Letter 8-26-22
  29. 48Y Fitchburg Turnpike PRD - Water-Sewer Comments 9-2-22
  30. 48Y Fitchburg Turnpike PRD - Cross sections -9-6-22
  31. 48Y Fitchburg Turnpike PRD - Applicant Response Letter 9-12-22
  32. 48Y Fitchburg Turnpike PRD - Health Comments 9-12-22
  33. 48Y Fitchburg Turnpike PRD - Applicant Presentation 9-13-22
  34. 48Y Fitchburg Turnpike PRD - Applicant Response 9-18-22
  35. 48Y Fitchburg Turnpike PRD - Concord Section 09-19-2022
  36. 48Y Fitchburg Turnpike PRD - Revised M-Plan - Loft Floor Plan 9-21-22
  37. 48Y Fitchburg Turnpike PRD - Concord Section 09-21-2022
  38. 48Y Fitchburg Turnpike PRD - Planner Report 9-23-22
  39. 48Y Fitchburg Turnpike PRD - Revised Landscape Plan 9-21-22
  40. 48Y Fitchburg Turnpike PRD - Civil Plans 03-03-2023
  41. 48Y Fitchburg Turnpike PRD - Revised Landscape Plan 09-29-22
  42. 48Y Fitchburg Turnpike PRD - Draft CR Plan 9-30-22
  43. 48Y Fitchburg Turnpike PRD - Conservation Restriction Plan 10-3-2022
  44. 48Y Fitchburg Turnpike PRD - Revised Landscape Plan 10-21-22
  45. 48Y Fitchburg Turnpike PRD - NRC Comments 10-3-22
  46. 48Y Fitchburg Turnpike PRD - PB Recommendation 10-12-2022 Final
  47. 48Y Fitchburg Turnpike PRD - Presentation 10-13-22
  48. 48Y Fitchburg Turnpike PRD - Revised Site Plans 10-19-2022
  49. 48Y Fitchburg Turnpike PRD - Applicant Response 11-8-22
  50. 48Y Fitchburg Turnpike PRD - Cross Section 11-10-2022
  51. 48Y Fitchburg Turnpike PRD - Pre-Existing Grade Letter 12-07-2022
  52. 48Y Fitchburg Turnpike PRD - Project Benefits Memo 1-5-23
  53. 48Y Fitchburg Turnpike PRD - William Henchy Letter to ZBA 2-7-23
  54. 48Y Fitchburg Turnpike PRD - Height Reductions Summary 2-23-23
  55. 48Y Fitchburg Turnpike PRD - Stormwater Managment Report 03-03-2023
  56. 48Y Fitchburg Turnpike PRD - 2015 Warrant
  57. 48Y Fitchburg Turnpike PRD - Building Sections
  58. 48Y Fitchburg Turnpike PRD - Dwelling Exterior Lighting Spec Sheet
  59. 48Y Fitchburg Turnpike PRD - Floor Plans-Elevations
  60. 48Y Fitchburg Turnpike PRD - House Energy Calculations
  61. 48Y Fitchburg Turnpike PRD - House Landscape Plan
  62. 48Y Fitchburg Turnpike PRD - Tree Exhibit
  63. 48Y Fitchburg Turnpike PRD Decision - Mar23DRAFT

 59 Walden St - 3/23